DOCUMENT LINK BELOW:
< ENERGY EFFICIENCY REPORT.PDF >
ABOUT THIS PROJECT
We were instructed to carry out an energy assessment to an Aermec Chiller on a London site. We compiled a report which is <LINKED> above. We offer all kinds of energy assessments and use Data Logging to compile ‘Real Site Telemetry’ on the best ways to diminish running cost.
The telemetry we capture includes Chilled Water Flow-rate, Compressor True Absorbed Power, Chilled Water Entering & Leaving Temperatures, Refrigeration Pressures & Saturation Temperatures deriving Suction & Discharge Superheats and Liquid Subcooling. With this data we can ‘Footprint’ any system and give accurate forecasts on running cost saving with little or no modification of the existing refrigeration and associated hydraulic systems.