YORK CHILLER VSD DC LINK FAULT
With the use of a PC Based Oscilloscope and a differential probe, it became evident that a problem with the DC Link was present.
We are proud of the work we’ve done with some amazing companies who are pushing the boundaries of what’s possible in the fields of applied robotics and Industrial IoT. Here are a few examples of how we’ve helped them successfully deploy their networks with our communications solutions.
With the use of a PC Based Oscilloscope and a differential probe, it became evident that a problem with the DC Link was present.
We attended site by request from the building manager on why newly retrofitted Soft Starter Units failed. The 3rd party installing electrician had installed this new technology on a previously standard motor starter system.
We attended site with multiple multi meters and 9 VDC Batteries for testing the SCR’s and IGBT assemblies, a gate switching fault soon became apparent.
Working on behalf of the incumbent Chiller Maintenance Contractor, we were asked to Retrofit a new Sabroe Unisab III Control System to an existing older Sabroe Unisab II System.