Case Studies
We are proud of what we have achieved for our clients to maximise their savings through its correct design and implementation. Here are some projects of how we’ve done for them.
CAREL CONTROL RETROFIT
Here at Orlando we like to breathe new life into old plant. It can be as simple as just fixing a single point of failure that has previously inhibited its reliability.
SITE DATA LOGGING REPORT FOR: METROPOLITAN POLICE, NEW SCOTLAND YARD, CURTIS GREEN. BOILERS 1 & 3
Orlando Refrigeration & Air conditioning have been asked to carry out Data Logging primarily on Boiler No.1 to determine the failure mode of the Reillo Burner.
BENTONE BURNER RETROFIT WORKS
Working on behalf of the incumbent HVAC Maintenance Contractor, we were asked to replace an End-Of-Life Burner on a Buderus Boiler Heat Exchanger.
ROBUR GAS FIRED ABSORPTION COMMISSIONING
We attended site on behalf of the Manufacturer to commission 7 Off Skids containing 5 off Robur Chillers each to provide cost efficient Comfort Cooling to a 24 story building.
PANASONIC GAS FIRED ENGINE VRF WORKS
Working on behalf of the incumbent HVAC Maintenance Contractor, we were asked to carry out the routine Preventative Maintenance Tasks on several Panasonic Gas Engine VRF Units.
CAREL CONTROLLER RETROFITTED TO MCQUAY CHILLER
We were contacted via our Web Contact Page by a customer who had issues with a 2003 McQuay ALS 312.3 three system chiller.