We attended site on behalf of the Manufacturer to commission 7 Off Skids containing 5 off Robur Chillers each to provide cost efficient Comfort Cooling to a 24 story building. We carried out our pre-commissioning checks which includes the Robur DDC Control terminations, Gas Tightness Test, Hydraulic System Venting and final power-up.

Three Robur DDC Controllers were needed to Sequence Control the 35 Robur Chillers, these had a Modbus Link the Trend Site BMS System.